No | Project Name | Owner | Start Date | Finish Date | Responsibilities | |
1 | Construction of 42-inch gas transmission pipeline in Sirik/Kuh Mubarak | Client: Iran Gas Engineering and Development Company | 2/7/2023 | Purchase of consulting services for supervising and third party inspection and suppling | ||
2 | Supervising for engineering, procurement and construction in Aban and Paydar Gharbi oil fields | Client: ZN Vostok Company Main Client: Petroleum Development Engineering Company |
13/07/2021 | 13/07/2023 | Supervising for engineering, procurement and construction | |
3 | Performing surface and underground engineering services for Golkhari Oil Fields development project | Client: North Hafari company Main Client:Southern Oilfields Company | 24/4/2021 | 24/4/2023 | Engineering contractor | |
4 | EPC project of Challenger and Grangan Square development | Client: Global Petrotech Kish Company Main client: Southern Oilfields Company |
19/4/2021 | 21/11/2022 | Engineering contractor | |
5 | Bitumen Production and Bitumen & Heavy Petroleum Products Export (Storage) Terminal | J. Oil Refining Company | 3/4/2021 | 23/10/2022 | Engineering contractor | |
6 | Khormoj gas Compressor station facilities (EPC Project ) | • National Iranian Gas Company (N.I.G.C) |
12/19/2019 | 3/19/2022 | Engineering contractor | |
7 | Goreh/jask crude oil transmission pipeline-trap and terminal station facilities (EPC Project ) | Petroleum Engineering and Development Co. (PEDEC) | 9/17/2019 | 3/16/2021 | Engineering contractor | |
8 | Shooshtar Gas Compressor Station | •National Iranian Gas Company (N.I.G.C) |
8/11/2014 | 3/19/2016 | • Basic and Feed Engineering • Preparation of EPC bid document • Management of EPC Contract (M.C.) |
|
9 | Haftkel Crude Oil Desalting Unit (Capacity :45,000 BPD) |
National Iranian South Oil field Co. (N.I.S.O.C.) |
10/2/2009 | 6/21/2017 | All EPC activities | |
10 | Gachsaran 3 Crude Oil Desalting Unit (Capacity : 110,000 BPD) |
National Iranian South Oil field Co. (N.I.S.O.C.) |
2/24/2008 | 9/22/2013 | • Feasibility Study • Basic and Detail Engineering • Preparation of EPC bid document |
|
11 | Marun-3 P.U. Crude Oil Sweetening Unit (H2S Removal) |
National Iranian South Oil Co. (N.I.S.O.C.) |
4/10/2010 | 3/11/2012 | • Feasibility Study • Basic and Detail Engineering • Preparation of EPC bid document |
|
12 | Gachsaran 4 Crude Oil Desalting Unit (Capacity : 110,000 BPD) |
National Iranian South Oil Co. (N.I.S.O.C.) |
11/26/2011 | 12/21/2013 | • Basic and Feed Engineering • Preparation of EPC bid document |
|
13 | Orumieh Oil Products Tank farm (100000m3Kerosene/Gasoline/Gasoil Storage Tank farm) |
National Iranian Oil Products Distribution Co. (N.I.O.P.D.C.) |
8/22/2008 | 9/24/2013 | • Basic & Detail Engineering • Procurement Services |
|
14 | Development of south Azadegan oil field North manifold phase1 | National Iranian Oil Engineering & Construction Co. (N.I.O.E.C) |
7/6/2015 | 9/22/2019 | E (Detail Engineering) | |
15 | Naeen-Yaz-Rafsanjan crude oil Transmission Pipeline and Pump Stations | National Iranian Oil Engineering & Construction Co. (N.I.O.E.C) |
5/8/2015 | 28/4/2022 | • Basic and Feed Engineering • Preparation of EPC bid document • Management of EPC Contract (M.C.) |
|
16 | IGAT VII Transmission Pipeline | • National Iranian Gas Company (N.I.G.C) |
1/23/2020 | 1/22/2021 | Management of EPC Contract (M.C.) | |
17 | Hot LPG main pipeline from phase 13,22-24 to phase 19 of south pars gas field | • National Iranian Gas Company (N.I.G.C) |
1/30/2020 | 1/29/2021 | Management of EPC Contract (M.C.) | |
18 | Rasht to Chalvand main gas pipeline | • National Iranian Gas Company (N.I.G.C) |
12/22/2019 | 4/21/2021 | Management of EPC Contract (M.C.) | |
19 | IGAT IX Transmission Pipeline | • National Iranian Gas Company (N.I.G.C) |
7/26/2017 | 8/21/2019 | · Management of EPC Contract (M.C.) | |
20 | IGAT VI Transmission Pipeline | • National Iranian Gas Company (N.I.G.C) |
9/22/2016 | 10/23/2019 | · Management of EPC Contract (M.C.) | |
21 | Abadan & Mahsahr Mile 40 Pump Stations and Terminal |
National Iranian Oil Engineering & Construction Co. (N.I.O.E.C) |
9/17/2014 | 20/3/2020 | Management of EPC Contract (M.C.) | |
22 | Borazjan-Bidboland Gas Compressor Station | • National Iranian Gas Company (N.I.G.C) |
12/3/2014 | 3/2/2016 | • Basic and Feed Engineering • Preparation of EPC bid document • Management of EPC Contract (M.C.) |
|
23 | Rasht-Neka Gas Transmission Pipeline (42”Dia , 382 Km length, 1750 psi ) |
National Iranian Gas Company (N.I.G.C) |
5/7/2014 | 5/7/2017 | • Basic and Feed Engineering • Preparation of EPC bid document • Management of EPC Contract (M.C.) |
|
24 | Rasht to Chalvand main gas pipeline | • National Iranian Gas Company (N.I.G.C) |
1/19/2015 | 8/6/2017 | E ( Basic Design) | |
25 | Tange-Bijar Gas Field Facilities (Phase II) |
Iranian Central Oil Fields Company (I.C.O.F.C.) |
12/21/2012 | 12/21/2015 | • Management of EPC Contract (M.C.) | |
26 | Tange-Bijar Gas Field Facilities (Phase I) |
Iranian Central Oil Fields Company (I.C.O.F.C.) |
4/28/2009 | 10/21/2012 | • Management of EPC Contract (M.C.) | |
27 | Tehran Refinery – Tabriz Crude Oil Pipeline and Pump Stations 650 Km – 20″ |
National Iranian Oil Engineering & Construction Co. (N.I.O.E.C) |
11/22/2008 | 10/24/2009 | •Feasibility Study • Basic and Detail Engineering • Preparation of EPC bid document |
|
28 | Bandarabbas Bitumen Terminal (Capacity ; 10,000 m3) | Pasargad Oil Company | 12/22/2007 | 4/19/2010 | • Basic & Detail Engineering • Procurement Services |
|
29 | Marun-5 P.U. Crude Oil Sweetening Unit (H2S Removal) |
National Iranian South Oil Co. (N.I.S.O.C.) |
4/10/2010 | 3/11/2012 | • Feasibility Study • Basic and Detail Engineering • Preparation of EPC bid document |
|
30 | Dalan-Shiraz Condensate Pipeline and Facilities (260 Km – 8″) |
National Iranian Oil Engineering & Construction Co. (N.I.O.E.C) |
3/6/2007 | 9/6/2011 | • Basic & Detail Engineering Activities • Procurement Services |
|
31 | Gas Condensate transfer Pipeline to Persian Golf Refinery (2×36” Dia , 42 Km length) |
National Iranian Oil Engineering & Construction Co. (N.I.O.E.C) |
7/15/2008 | 3/20/2010 | Endorsement/Supervision of Engineering | |
32 | Khoramabad-Maleyer Gas Transmission Pipeline (36” Dia. , 168 Km length, 1750 psi) |
• National Iranian Gas Company (N.I.G.C) |
8/23/2007 | 7/15/2008 | • Feasibility Study • Basic and Feed Engineering • Preparation of EPC bid document |
|
33 | Pole Kaleh-Koohe Namak Gas Transmission Pipeline (42”Dia , 68 Km length, 1750 psi ) |
• National Iranian Gas Company (N.I.G.C) |
12/21/2012 | 6/28/2015 | Management of EPC Contract (M.C.) | |
34 | 2nd PIPELINE OF SANANDADJ (BIJAR-DEHGOLAN) | • National Iranian Gas Company (N.I.G.C) |
8/8/2005 | 11/20/2008 | Management of EPC Contract (M.C.) | |
35 | Ghazvin-Rasht Gas Transmission Pipeline (56” Dia. , 220 Km length, 1750 psi) |
• National Iranian Gas Company (N.I.G.C) |
9/14/2011 | 9/21/2012 | Management of EPC Contract (M.C.) | |
36 | Development of Gas Distribution Network In Qom State | National Iranian Gas Company (N.I.G.C) |
10/23/2006 | 10/23/2009 | Construction Supervision of EPC projects | |
37 | Utility and Offsite of kermanshah HDPE petrochemical Complex |
Kermanshah Polymer Company | 4/25/2007 | 12/21/2008 | Basic & Detail Engineering |