Haftkel kerosene desalination unit
Construction of Gachsaran 3 desalination unit
Middle East Energy Development Consulting Engineers
Construction of Urmia oil depot certificates
Notification to work supervising for engineering, procurement and construction in Aban and Paydar Gharbi oil fields
Supervising the performance of EPC contractor engineering activities, procurement of goods and construction and HSE, monitoring the progress and schedule of the project, supervising the pre-commissioning and commissioning in Aban and Paydar Gharbi oil fields
Notification of the operation of bitumen production and storage complex near Bandar Abbas refinery with a production capacity of 600,000 tons of different grades of bitumen, by J Oil Refining Company
This project will be implemented with the aim of constructing facilities and equipment for production, storage and loading of bitumen. Also, a filling barrel field with all the required equipment with an approximate capacity of 3,000 barrels per day is considered.
Notification of Challenger and Grangan oil fields
– Changing the Chelinger 3 well separator set to a separation unit and strengthening the oil pressure and oil transfer pipeline to the Bibi Hakimeh 1 exploitation unit
– Construction of separation unit and booster of Grangan oil pressure and gas transmission pipeline to Bibi Hakimeh 1 gas booster station
Purchase and installation of a pump with a capacity of 30 bar and the pipeline required for the transfer of salt oil from satellite fields from Bibi Hakimeh 1 to Bibi Hakimeh 2
Obtaining new quality certificates (ISO 14001: 2018 and ISO 45001: 2018)
Certificate extension (2015: ISO 9001), (ISO / TS 29001: 2010), (ISO 21500: 2012) and (HSE-MS)
Establishment of Poopak office automation system for engineering projects
Completion of the project of constructing hot LPG transmission lines from refineries of phase 13, 22 and 24 to refineries of phase 19 of South Pars joint field